Job description
Job Description/Summary
The Scheduler will work with project management teams in developing schedules, from Bidding/Proposal through commission and turnover to owner. This individual works with the VP of Operations and project management team to monitor and control project schedules to enhance project execution.
Job Requirements/Qualifications
- Develop, monitor, control and update in depth project schedules using Primavera software to ensure projects are optimally executed
- Assist in planning and developing detailed engineering and construction baseline schedules for projects including cost loading and CPM scheduling
- Analyze drawings, specifications and statements of work in the preparation of activity networks for project resource planning and scheduling.
- Assist in reviewing project schedules with the project management teams to ensure compliance with contract, reviewing progress and reporting variances
- Maintain communications and support the interchange of information between the project and other involved agencies.
- Assist estimating in developing preconstruction schedules and proposal schedules.
- Analyze progress reports against the schedules for projects.
- Visit construction sites to evaluate the actual construction status relative to proposed schedule and budget.
- Analyze the impacts of changes to schedules and cost proposals by developing and maintaining fragnets and performing time impact analysis
- Manage multiple projects simultaneously.
- Undergraduate degree in engineering, architecture, construction management or a related discipline
- 5-7 years scheduling experience on similar size and scope construction projects.
- Advanced proficiency in Primavera (P6) software; experience using software to analyze project schedule risk.
- Experience working on construction projects with CPM and cost loaded schedules.
- Enterprise/server based scheduling a plus.
- Detail oriented and can manage multiple priorities in a fast paced environment
- Skilled at developing relationships with owners, subcontractors, senior leaders and project teams.
- High degree of initiative, personal responsibility, and integrity.
- Passion for the work and industry a must.
Benefits
- Health and Dental Insurance
- 401K Program
- Profit Sharing
- Paid Holidays
- Paid Leave
Curtis Contracting, Inc. (CCI) is a class 'A' contractor prequalified with VDOT and has been in business since 1985. We are separated into multiple divisions including the Civil division, Heavy Highway division, Road/Bridge Maintenance division, and Federal division. CCI has a large equipment fleet and self performs all aspects of construction management, site work, utilities, demolition, heavy highway, and cast-in-place concrete. Curtis Contracting, Inc. was founded on the principles of ethics, partnering, quality, integrity, safety and environmental stewardship. These principles and hard work are carried out through our leadership team. CCI has a large equipment fleet and self performs all aspects of construction management, site work, utilities, demolition, heavy highway, cast-in-place concrete, installation of divisions 8 & 10 items, and erection of pre-engineered metal structures. We hope you join our team!
If interested, please call or text 804-837-9996 or the office 804-843-3350. Visit our website at http://www.curtiscontracting.net/careers/ for all of our job postings.
***Curtis Contracting, Inc. is an equal opportunity employer, including disabled and veterans***
offroadmanagementgroup.com is the go-to platform for job seekers looking for the best job postings from around the web. With a focus on quality, the platform guarantees that all job postings are from reliable sources and are up-to-date. It also offers a variety of tools to help users find the perfect job for them, such as searching by location and filtering by industry. Furthermore, offroadmanagementgroup.com provides helpful resources like resume tips and career advice to give job seekers an edge in their search. With its commitment to quality and user-friendliness, offroadmanagementgroup.com is the ideal place to find your next job.